  1. Step 1OpenTrees & Spanning TreesA tree is connected and acyclic, and a spanning tree contains every vertex of the original graph.
  2. Step 2OpenMinimum Spanning TreesA minimum spanning tree connects every vertex without cycles at the smallest possible total edge weight.
  3. Step 3Full accessKruskal's AlgorithmKruskal’s algorithm builds a minimum spanning tree by considering edges in increasing weight order and accepting only those that do not create a cycle.
  4. Step 4Full accessPrim's AlgorithmPrim’s algorithm builds a minimum spanning tree by repeatedly choosing the cheapest edge joining the current tree to a new vertex.
  5. Step 5Full accessDijkstra's Shortest-Path AlgorithmDijkstra’s algorithm finds shortest distances from a starting vertex by settling the smallest temporary label and updating its neighbours.
  6. Step 6Full accessBellman's Principle & Dynamic ProgrammingBellman’s principle finds an optimal policy by combining each immediate cost with the best remaining cost from the next state.
  7. Step 7Full accessChoosing, Comparing & Justifying AlgorithmsChoose an algorithm by matching its objective and assumptions to the network problem.
  8. Step 8Full accessProject Scheduling — Critical Path, Early/Late Times & FloatA project's minimum duration is set by its longest dependency path, while forward and backward passes reveal each activity's timing limits.