Step 7 of 8 · Worked example · TEACH
0 of 3 done
Work through the example to CHECK to open the problems.
Reach CHECK to open the problems.Ordinary Level · Applied Maths · Mathematical Modelling · Step 7Follow the worked example and explain why each modelling and calculation step is valid.
A service-time model is T=10+7n minutes, where n is the number of jobs. For n=13, calculate the predicted time and state what the output means.
A service time model is T = 10 + 7n minutes, where n is the number of jobs.
For n = 13, calculate the predicted time and state what the output means.
Ordinary Level Applied Maths · Mathematical Modelling · Step 7 of 8
Calculate from a model while keeping track of what each input and output represents.
A numerical result is useful only when its units and meaning fit the original situation.
A service time model is T = 10 + 7n minutes, where n is the number of jobs. For n = 13, calculate the predicted time and state what the output means.