Step 7 of 8 · Worked example · TEACH

← Mathematical Modelling

0 of 3 done

Work through the example to CHECK to open the problems.

Reach CHECK to open the problems.Higher Level · Applied Maths · Mathematical Modelling · Step 7

Follow the worked example and explain why each modelling and calculation step is valid.

A service-time model is T=6+3n minutes, where n is the number of jobs. For n=9, calculate the predicted time and state what the output means.

A service-time model is T = 6 + 3n minutes, where n is the number of jobs.

For n = 9, calculate the predicted time and state what the output means.

Read it once, slowly. Then copy it onto your page.
  • What is going on? A model gives a time T in minutes for a number of jobs, n.
  • What is fixed? This time there are 9 jobs.
  • What do they want? Two answers: the time, and what that number means in words. A number alone is half the marks.
Céim

Higher Level Applied Maths · Mathematical Modelling · Step 7 of 8

Computing, Simulating & Interpreting

A model's calculated output must retain the meaning, units and constraints of the original situation.

Why it matters

In an exam, interpreting a result distinguishes a justified modelling answer from an unexplained calculator output.

The worked example

A service-time model is T = 6 + 3n minutes, where n is the number of jobs. For n = 9, calculate the predicted time and state what the output means.

How the worked example goes

  1. Read

    • What is going on? A model gives a time T in minutes for a number of jobs, n.
    • What is fixed? This time there are 9 jobs.
    • What do they want? Two answers: the time, and what that number means in words. A number alone is half the marks.
  2. Understand

    • How do I picture it?
    • 1 job: 6 + 3 = 9 min. 2 jobs: 6 + 3 + 3 = 12 min.
    • The 6 min comes once, whatever happens: a setup time. Each job adds 3 min.
  3. Reduce

    • Where do I start?
    • Put n = 9 into the model. The exam word is substitute.
    • T = 6 + 3(9)
  4. Solve

    • Work it out.
    • Multiply before adding: the 3 belongs to each job.
    • T = 6 + 3(9)
  5. Check

    • Is it right?
    • Take off the setup, divide by 3 min per job
    • 33 − 6 = 27 min